Current Projects


Click here for NEW Commercial Clip

New Advantage BMW – Midtown Houston. Opening November 2008!



Specs on New Solar Powered Dealership.

The array consists of 10 rows of 15 panels of Kyocera 205watt. This Produces 30.75kW or 3077kwh per month. It will account for 18-20% of monthly consumption. PV System Size: 30.75 kW Yearly Power Generation: 36, 926 kWh Monthly Power Generation: 3, 077 kWh 30 Year Power Generation: 1, 103, 619 kWh Equivalent Number of Carbon Absorbing Trees: 4, 431 trees. CO2 Emissions Prevented: 2, 115, 860 pounds. Amount of Smog and Acid Rain Causing Pollutants Prevented: 12, 186 pounds of NOx and Sox. River Water Kept Clean from Mercury Poisoning: 1, 883, 226 gallons. Estimated System Offset: 18%-20% of current consumption. There will also be a 42 inch flat-screen in the customer lounge area for monitoring constant production and performance of system.

The New Mercedes Benz of Beverly Hills Service Center



This service center is a state of the art service facility. Three stories with a basement and parking deck on top. The basement houses all the detailing of cars and two full size car washes. The service area has 78 work stalls, a three story Remstar parts carousel and can hold an additional 250 cars for sales and service. Total square footage- 206,000!

The New Sterling McCall Restoration Center



Specs on the New Collision Shop

Total Facility

55,540 Square Feet

Paint Center (18,360SF)
9 down draft paint booths with dedicated quick lane.

Metal Shop (26,210SF) 42 work Stalls w/10 recessed and 2 above ground frame machines, 10 in ground Rotary Lifts, Vac system and Compressed air loop throughout.
208V and 480V welding outlets through that shop. 16’ diameter ceiling fans for maximum air circulation